Archive

HPM was engaged to provide full project management from concept and design to construction, liaising with all stakeholders throughout the process. The office was redesigned and updated, necessitating the temporary relocation of staff off-site, making the programme critical. The project also involved converting an existing storage area into a new administration area. Due to the nature of the client's work, their staff still had equipment stored on-site that needed to be accessed during construction. The health and safety of this access needed to be managed carefully as staff were entering parts of the construction site. Additionally, due to the conversion of...

The Hastings Street Retail Fit Out and Strengthening project was a significant undertaking in the art deco quarter of Napier City. HPM played a crucial role in managing the design and overseeing the construction phases, which included demolition, alteration, strengthening, and new fit-out. As a result of these efforts, the building achieved 70% NBS (New Building Standard) once strengthened. Given the building's location in the art deco quarter, obtaining Resource Consent was essential, and HPM was actively involved in this process. The project's location in a busy part of town also necessitated careful consideration of public safety throughout the construction period....

Halcyon Project Management has been successful with obtaining a position on the Ministry of Education’s new Property Project and Programme Management (PPPM) Panel, commencing 2025. We look forward to adding some completed current projects here under the new Panel, please ask us for details about our team’s historical education project experiences....

HPM’s leadership in managing the development of Gisborne Hospital’s new $31.1 million mental health facility has been pivotal to its success. This state-of-the-art facility, designed to provide early intervention and preventive care for mental health and addiction, reflects both the community's needs and cultural values. From the outset, the importance of HPM's project management approach stood out for its personalised, hands-on style. HPM’s ability to build strong relationships with a diverse range of stakeholders—including health officials, local community members, and contractors—ensured that all parties were aligned toward a shared goal. They provided clear communication and demonstrated an in-depth understanding of the...

The development of a new world-class 150MW geothermal power station on the Tauhara geothermal field in Taupo, valued at $924 million, represents a significant advancement in renewable energy for New Zealand. HPM was involved in a $600 million portion of this project and were instrumental in the project's success, having been engaged to develop and maintain comprehensive programme control systems. Their responsibilities encompass the overall scheduling and provision of detailed project reporting, including risk management, programming updates, and regular reports to the Project Control Group (PCG) and the broader project team. HPM's involvement ensures that all aspects of the project's...

This private development was executed in three phases. Phases one and two, which included the Manager's Lodge and Implement Shedding, were completed by February 2019, with phase three finished in 2021. The development consists of high-end residential construction, with phase three featuring a 1,000 sqm dwelling. This phase combines in-situ and precast concrete, along with structural steel, integrated with the latest servicing technology and premium finishing materials such as the use of aged copper on the roof and cladding. Notably, the home includes a striking large timber wave ceiling that spans much of the residence, making it one of the...

Over the years, HPM has played a pivotal role in a wide range of housing developments throughout the Napier and Hastings regions, fulfilling various key roles including Project Manager and Engineer to the Contract. Our extensive expertise and unwavering commitment to quality have been central to the successful delivery of numerous high-profile projects, demonstrating our capacity to manage and execute complex housing initiatives. Each project reflects HPM’s dedication to improving local communities through thoughtfully designed and expertly delivered housing solutions. Our comprehensive approach ensures that every development not only meets but consistently exceeds expectations, providing residents in Napier and Hastings...

This inner-city heritage building was refurbished into new open plan offices as per architectural drawings. The building was also under seismic code and required seismic strengthening to comply. This was a challenging project due to its inner-city location and requirements of time frame. Overall, the project was completed to a very high standard and within the 5-month timeframe. This is an old historic building of Napier, and with this always comes challenges that require problem solving along the way. For HPM to have been involved with this project we ensured that any challenges faced along the way were dealt with...

This was a 750sqm heritage building that was being used as a restaurant downstairs and under-utilised function room upstairs. As it had been a nightclub in the past it had a large internal void where customers could look down from the 2nd floor to the dancefloor below. The building required a change of use which involved the void being filled in to convert the 2nd floor into high end architectural apartments. HPM managed this process along with the construction, which included reconfiguring the downstairs restaurant and adding a courtyard which in collaboration with Heritage New Zealand complimented the old original...

Hawkes Bay Regional Sports Park was constructed via a comprehensive phased development, the overall goal of this development was to enhance the athletic performance and community well-being of Hawkes Bay and wider regional area. As the client-side project manager and engineer, HPM played a pivotal role in orchestrating the design, tender, and construction phases of various projects within the complex. ​ Stage One - High-Performance Sport and Wellness Centre: Completed in May 2019, Stage One marked the ​ inauguration of the $80 million endeavour. The 2800sqm facility boasted state-of-the-art amenities including a strength​ and conditioning gym, running track, pole vault, long jump...